How Much Does a 2 Ton AC Replacement Cost?
A 2 ton air conditioner provides approximately 24,000 BTUs per hour of nominal cooling capacity. Equipment can cost approximately $2,500 to $3,500 before the complete installation scope.
Labor, indoor equipment, refrigerant line work, controls, electrical requirements, removal of existing equipment, and permits can increase the final amount. A 2 ton unit does not automatically fit a particular square footage, so the contractor calculates the home’s cooling load before selecting 2 ton equipment.
How Much Does a 3 Ton AC Replacement Cost?
A 3 ton air conditioner provides approximately 36,000 BTUs per hour of nominal cooling capacity. General equipment costs can fall around $3,000 to $4,200, while the complete installed project costs more after labor and required materials.
A straightforward 3 ton central AC replacement with suitable existing infrastructure can remain within the general $3,800 to $7,900 central AC replacement range. Duct modifications, electrical work, new controls, or indoor equipment changes can increase the total.
How Much Does a 4 Ton AC Replacement Cost?
A 4 ton air conditioner provides approximately 48,000 BTUs per hour of nominal cooling capacity. Equipment can cost around $3,500 to $5,000, depending on efficiency and equipment configuration.
The installed cost can increase when the project includes a new indoor coil, air handler, thermostat, refrigerant tubing, electrical modifications, or duct corrections. The contractor should not install a 4 ton system simply because the previous air conditioner used the same nominal capacity. A new load calculation confirms required capacity.
How Much Does a 5 Ton AC Replacement Cost?
A 5 ton air conditioner provides approximately 60,000 BTUs per hour of nominal cooling capacity. Equipment can cost approximately $4,000 to $6,000 or more before complete installation expenses.
Higher capacity equipment can also require compatible indoor components and suitable airflow, and the existing duct system must support the airflow requirements of the selected equipment. The contractor evaluates cooling load and air distribution before recommending a 5 ton replacement.